EV Charging Station EPC Services in India

Altarbyte provides comprehensive end-to-end EV charging station EPC services across India. Engineering, procurement, construction, testing, commissioning, and ongoing operations and maintenance for complete EV charging infrastructure.

What is EV Charging EPC?

Engineering, Procurement, and Construction (EPC) is a project delivery method where a single contractor manages the entire project lifecycle from initial concept through to handover. For EV charging infrastructure, EPC services encompass site feasibility studies, detailed engineering design, equipment procurement, construction and installation, testing and commissioning, and final handover to the client. This integrated approach reduces coordination risks, accelerates project delivery, and provides a single point of accountability.

Altarbyte's EV charging EPC services are designed to deliver turnkey solutions for operators who want a fully operational charging station without the complexity of managing multiple contractors. Our in-house team handles every aspect of the project, leveraging our deep expertise in electrical engineering, civil construction, regulatory compliance, and charging technology.

Complete EV Charging Station EPC Scope

Our EV charging station EPC services cover the complete project lifecycle. We begin with detailed site feasibility and load assessments, evaluating electrical capacity, grid connectivity, civil conditions, and commercial viability. Our engineering team then develops comprehensive design packages including electrical single-line diagrams, cable routing plans, foundation designs, and equipment specifications.

  • Site feasibility and load assessment: Comprehensive evaluation of site conditions, electrical capacity, grid connectivity, and commercial potential.
  • Electrical design and HT/LT infrastructure: Complete electrical design including panel schedules, cable sizing, protection coordination, and compliance documentation.
  • Transformer and distribution systems: Transformer specification, grid impact studies, DISCOM coordination, and distribution network design.
  • EV charger supply and installation: Procurement of certified charging equipment, professional installation, and integration with electrical systems.
  • Cable routing and protection systems: Optimized cable routes, trenching, containment systems, and protection devices.
  • Earthing and electrical safety: Comprehensive earthing design, lightning protection, and safety systems compliant with national electrical codes.
  • Civil works and charger foundations: Site preparation, foundations, cable trenches, enclosures, and all required civil construction.
  • Testing and commissioning: Factory acceptance testing, site acceptance testing, performance verification, and regulatory inspections.
  • CMS and payment integration: Charging management software setup, payment gateway integration, RFID authentication, and mobile app configuration.
  • Operations and maintenance: Ongoing maintenance programs, remote monitoring, firmware updates, and 24x7 support coverage.

EPC Delivery Model Advantages

Altarbyte's EPC delivery model offers significant advantages over traditional multi-contractor approaches. Single-point accountability means one team is responsible for schedule, budget, and quality. Integrated design and construction eliminates coordination gaps and rework. Our established supply chain ensures timely equipment procurement, while our regulatory expertise accelerates approvals. Clients benefit from predictable project outcomes and reduced management overhead.

Project Timeline and Milestones

A typical EV charging station EPC project follows a structured timeline. Feasibility and design span 4-6 weeks, covering site assessment, engineering design, and regulatory submissions. Procurement and construction take 6-10 weeks, including equipment manufacturing, civil works, and electrical installation. Testing and commissioning requires 2-4 weeks, ensuring all systems operate correctly before handover. Total project duration from initiation to operational status typically ranges from 3-5 months.

Quality Assurance and Standards

Altarbyte maintains rigorous quality standards throughout the EPC process. Our quality management system is certified to international standards, covering design verification, material inspection, construction supervision, and final testing. All installations undergo third-party inspection where required by local regulations. Our commitment to quality ensures long-term reliability and minimizes lifecycle costs for our clients.

Compliance & Certifications

Altarbyte products and installations are fully compliant with Indian regulatory requirements and international standards.

BIS CRS (IS 17017)

Mandatory certification for all AC & DC chargers sold/imported in India.

ARAI / ICAT (AIS-138)

Automotive safety testing for conductive AC/DC charging standards.

NABL Accredited Labs

Mandatory accredited testing facilities for issuing valid test reports.

OCPP 1.6J / 2.0.1

Network protocol required for networked and public charging stations.

Start Your EV Charging EPC Project

Partner with Altarbyte for turnkey EV charging station EPC services. From feasibility to commissioning, we deliver complete solutions with local regulatory compliance across India.