Altarbyte Logo
Free ROI Tool

EV Charging Station ROI Calculator

Estimate your total investment and returns for Altarbyte DC fast charging infrastructure in Andhra Pradesh and Telangana.

Charger Selection (Mix & Match)

60 kW DC Fast Charger

₹8.5 Lakhs + 18% GST = ₹10,03,000

0

120 kW DC Fast Charger

₹12.5 Lakhs + 18% GST = ₹14,75,000

1

180 kW DC Fast Charger

₹14.5 Lakhs + 18% GST = ₹17,11,000

0

240 kW DC Fast Charger

₹17.5 Lakhs + 18% GST = ₹20,65,000

0
1 Charger — Total Load: 120 kWReq. Transformer: 160 kVA

Land Dimensions

Area: 30 x 20 ft55.7 sq m — Civil cost @ ₹500/sq m

Note: Civil work costs (foundation, canopy, site preparation) may vary based on soil conditions, site accessibility, local labor rates, and material availability. This estimate of ₹500/sq m is an average for AP/Telangana. Actual costs will be calculated during site assessment and project planning by the Altarbyte team.

HT Transformer

Required kVA auto-matched from OEM spec at 80% load factor

160 kVA — Vajra

Load: 120 kW ÷ 0.8 = 150 kVA required → nearest available: 160 kVA

Available ratings: 25, 63, 100, 160, 250, 315, 500 kVA

₹14,40,000

Electricity Tariff

Select your state and supply category for accurate operating cost calculation

State: Andhra Pradesh

Category: EV Charging Station (Special Tariff)

Energy charge:5.85 per unit (kWh)

Fixed/Demand charge:350 per kW/kVA per month

APERC special tariff for EV charging infrastructure

Revenue Parameters

Mixed fleet average55 kWh @ 80% charge per session

Base: ₹22/unit + 18% GST = 25.96/kWh billed to EV customer

Chat with us